OUR SUPPORT

April 2023 Update

Versions 4.006.004.023-65b9c0d1.1-C, 4.006.004.023-cd0cb675.2-C, 4.019.004.023-7314e86f.1-C, 4.027.004.023-787c44b7.1-cobra, 4.028.004.023-e90bdbfad.1-C

New Features and Functionality

  • New mimic field to display the length of time a machine has been running for
  • New mimic field to display last cycle time, for use when generating cycles signals manually
  • Ability to set a default sort on MESi reports for machine name
  • Ability to sort columns in MESi reports in ascending or descending order
  • Preferences for export format and duration format are now remembered in Gantt Reports, Event Viewer and MESi table exports
  • Preferences in the format, job data and grouping fields are now remembered in the MESi Export screen

Upgrades

  • Enhancement to the Material Requirements Gantt Report, so that it displays materials required for the selected time period rather than the entire job

Various fixes & minor updates, including

  • Fix to Event Viewer and Material Requirements Gantt Report for composite jobs, to display the details of each composite part correctly
  • Fix to the current stop time mimic field to display the correct value
  • Fix to the bug causing the stopped, slow and fast cycle fields to be recalculated when they shouldn't be

Need help?

View our videos, guides and walkthroughs on how to optimise your Intouch monitoring solution.

Alternatively get in touch with our expert support team.

Contact Support >